• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Trending:
  • Kashmir
  • Elections
Monday, June 8, 2026

Daily Times

Your right to know

  • HOME
  • Latest
  • Iran-Israel war
  • Gilgit Baltistan Election
  • Pakistan
    • Balochistan
    • Gilgit Baltistan
    • Khyber Pakhtunkhwa
    • Punjab
    • Sindh
  • World
  • Editorials & Opinions
    • Editorials
    • Op-Eds
    • Commentary / Insight
    • Perspectives
    • Cartoons
    • Letters to the Editor
    • Featured
    • Blogs
      • Pakistan
      • World
      • Lifestyle
      • Culture
      • Sports
  • Business
  • Sports
  • E-PAPER
    • Lahore
    • Islamabad
    • Karachi

GDA initiates Gwadar potable water mechanism

Published on: February 25, 2026 1:08 AM

To keep Gwadar water supply system smooth and steady, Gwadar Development Authority (GDA) has rolled out a new drinkable water mechanism.

Under the new initiative, a meeting of the water committee launched a crackdown on illegal water connections in Gwadar, according to a report carried by Gwadar Pro on Tuesday.

The meeting was held on February 23 under the chairmanship of the Director General Gwadar Development Authority, Moeen ur Rehman Khan.

It was clarified in the meeting that the GDA’s main pipeline laid from Shadi Kor Dam to Gwadar was primarily designed to supply water to Gwadar city, and its capacity is aligned solely with Gwadar’s requirements.

The meeting also reviewed technical issues affecting the water distribution system in various parts of the city, and it was decided to lay new pipelines where required.

The Executive Engineer Distribution was instructed to immediately ensure the installation of new lines at necessary locations and to further strengthen and expedite unrestricted legal action against illegal connections and water theft on main pipelines.

The issuance of new water connections and the implementation of a formal billing system were also reviewed. It was informed that the installation of new connections is underway and comprehensive consumer data is being compiled so that the billing system can be activated at the earliest.

It was further decided that water supply across the city will be provided through GDA’s newly laid pipelines and constructed water storage tanks, as PHE’s old water infrastructure has become obsolete and non-functional, which increases the risk of water losses.

The meeting further clarified that the responsibility for water supply to Pasni city lies with the Public Health Engineering Department (PHE).

PHE does not have a fully separate pipeline from the dam to Pasni, and approximately 18 kilometers of the pipeline are still pending. As a result, PHE relies on the Irrigation Department’s water channel and the GDA pipeline.

However, despite its limited capacity and with Gwadar’s needs in view, GDA has continued to supply water to Pasni as supplies permit.

Filed Under: Pakistan Tagged With: GDA, Gwadar Development Authority

Submit a Comment




Primary Sidebar




Latest News

Mahira Khan reacts to acid attack on Quetta doctor, calls incident ‘barbaric’

Taylor Swift becomes richest female musician in history as net worth hits $2 billion

Lily Collins brings ‘Emily in Paris’ charm to French Open

Kim Kardashian cheers on Lewis Hamilton amid growing romance

Momina Iqbal’s rukhsati date revealed by sister

Pakistan

GB polling concludes peacefully: PPP, PML-N and PTI claim leads

Government warns against attempts to fuel unrest in AJK

Bilawal calls for dialogue to resolve AJK political crisis, meeting with PM likely

27 terrorists killed in North Waziristan IBOs: ISPR

Naqvi meets FM Araghchi, delivers CDF Munir’s message to Khamenei

More Posts from this Category

Business

Businesswomen call for economic inclusion, increased opportunities in budget discussions

OPEC+ agrees fourth oil quota hike since Hormuz closure

Global airlines slash 2026 profit forecast on fuel shock from Iran war

Economic pressure rises as joblessness hits record level, inflation shows no relief: BMP

‘FPCCI budget proposals can attract investment’

More Posts from this Category

World

Trump calls for more ‘surgical’ strikes against Hezbollah

42nd anniversary of Operation Blue Star: Stark reminder of Indian state’s tyranny towards Sikhs

Israel kills nine in Gaza as Egypt hosts new ceasefire talks

More Posts from this Category




Footer

Home
Lead Stories
Latest News
Editor’s Picks

Culture
Life & Style
Featured
Videos

Editorials
OP-EDS
Commentary
Advertise

Cartoons
Letters
Blogs
Privacy Policy

Contact
Company’s Financials
Investor Information
Terms & Conditions

Facebook
Twitter
Instagram
Youtube

© 2026 Daily Times. All rights reserved.

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.